Saturday, March 23, 2013

1999 Mitsubishi Mirage 1 5L Engine Service Manuals

ENGINE ASSEMBLY INSTALLATION Install the engine assembly, checking that the cables, hoses, and harness connectors are not pinched. ENGINE MOUNT BRACKET INSTALLATION 1. Place a garage jack against the engine oil pan with a piece of wood in between, and install the engine mount bracket while adjusting the position of the engine. 2. Support the engine with the garage jack. 3. Remove the chain block and support the engine assembly with the special tool. HIGH-PRESSURE FUEL HOSE INSTALLATION 1. Apply a small amount of new engine oil to the O-ring.
Caution Do not let any engine oil get into the fuel rail. 2. While turning the fuel high-pressure hose to the right and left, install it to the fuel rail, while being careful not to damage the O-ring. After installing, check that the hose turns smoothly. 3. If the hose does not turn smoothly, the O-ring is probably being pinched. Disconnect the high-pressure fuel hose and check the O-ring for damage. After this, re-insert the fuel rail and check that the hose turns smoothly.

Get from here to download 1999 Mitsubishi Mirage 1,5L Engine Service Manuals

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.